Procurement entry for cryogenic tanks and LNG storage / regasification equipment, linking individual tanks with vaporizers, regulation, metering and station supply.

Cryogenic storage equipment (reference scene)

Cryogenic storage equipment (reference scene)

APPLICATIONS

Equipment duty and applications

  • LOX, LIN and LAR tanks or gas supply equipment packages
  • LNG storage, regasification and industrial fuel supply
  • Replacement cryogenic equipment and staged expansion

SUPPLY SCOPE

What you can request from Huawang

  • Request a single tank, multiple units or a storage-to-use equipment package
  • Optional vaporizers, pressure regulation and metering skids, valve groups and cryogenic piping can be included in the RFQ
  • For a gas supply station, include unloading, storage, vaporization, gas delivery and installation / commissioning requirements

Huawang organizes tank and gas supply packages. The quotation identifies in-house fabrication, specialist sourcing, joint supply and integration scope, together with equipment sources and site-service responsibilities.

PROJECT PACKAGE

LNG storage tank and regasification station RFQ

  • Request a tank alone or include unloading, vaporizers, pressure regulation, metering, odorization, piping and controls in a station inquiry
  • Provide gas composition, inventory, unloading method, normal / peak demand, outlet pressure, boil-off gas handling concept, heat source and power
  • The proposal separates tank construction, specialist supply, site design, civil works, utilities, installation and commissioning; LNG and LPG equipment are selected separately

RFQ INPUT

Start a quotation with the information you have

Send the conditions, datasheet, sketch or equipment list you already have. We will help confirm the missing information.
  • Medium, purity, application and storage state; inventory or usable capacity and quantity
  • Normal consumption, peak flow, delivery pressure and continuous-operation requirements
  • Operating and design pressure / temperature, insulation arrangement, connections and gas-quality requirements
  • Ambient conditions, available heat source and power, and standby requirements
  • Installation location, layout constraints, destination requirements, transport and requested delivery date

SELECTION & INTERFACES

Conditions that shape equipment and quotation

  • Differentiate low-temperature steel pressure vessels, vacuum-insulated cryogenic tanks and large atmospheric flat-bottom tanks
  • Specify stationary storage duty; discuss ISO containers, road tankers or cylinders separately against their equipment requirements
  • Ambient conditions, heat source and continuous duty guide vaporizer and standby configuration

MANUFACTURING & DOCUMENTS

Manufacturing and delivery documents

Request an individual cryogenic tank or a storage, vaporization, regulation and metering package. Supply documents are prepared for the medium and tank construction, including datasheets, interface drawings, inspection plans and operating documentation.

  • Request the proposed manufacturer's current applicable credentials and the agreed design / drawing list
  • Confirm material traceability, welding / NDE records, pressure and leak tests, and inspection witnessing as applicable
  • For the agreed cryogenic scope, include insulation / vacuum checks where applicable, cleaning records and operating / commissioning documents
Review the published fabrication and inspection chain →

RELATED PROCUREMENT

Related equipment and supply paths

EXPORT PROCUREMENT

Cryogenic Tank Types & Procurement Paths

Choose a procurement path by medium and use, then establish whether the project needs pressurized vacuum-insulated storage, large atmospheric storage or transport equipment. Stationary tanks, ISO transport containers and road tankers have different ordering scopes. Existing drawings, specifications or an equipment list can start an inquiry.
Purchase conditions and supply interfaces
Purchase itemConditions to provideSupply and responsibility boundary
Oxygen/nitrogen/argonLiquid/gas use, purity, refilling and continuous dutySeparate oxygen cleaning from nitrogen/argon quality interfaces
LNG/CO2/hydrocarbonsComposition, phase, operating pressure/temperature and outlet dutySelect construction and controls by service, not the shared cryogenic label
Pressurized / atmosphericDesign basis, scale, fabrication location and site conditionsPrice shop-delivered equipment and site construction separately

Conceptual equipment sequence

Purchasing sequence only, not a P&ID or construction drawing. Confirm process, safety and control design for the actual site.

  1. 1Medium and use
  2. 2Tank construction
  3. 3Equipment combination
  4. 4Supply / site-work interface

Send the information already available

  • Medium, equipment type, capacity/flow, quantity and existing files
  • Actual unloading, pump, vaporization/regulation or transport-equipment needs
  • Country, code requirements, schedule and transport limits
  • Include installation country/site, medium, capacity or flow with unit basis, operating/design pressure and temperature, quantity, destination requirements, optional equipment, requested date and transport constraints. Mark unknown items as open; send the existing specification, drawing or equipment list first.

Manufacturing, documents and delivery agreement

Confirm each role and deliverable in the quotation
Purchase itemConditions to provideSupply and responsibility boundary
Equipment originIdentify tank fabrication within the accepted scope and each vaporizer, pump or valve train as in-house, specialist-sourced, jointly manufactured or integratedThe quotation identifies actual makers, applicable credentials and responsibilities; a requested destination approval is not an existing certification
Inspection and documentsAgree datasheets, interface drawings, ITP, material/welding/NDE records, tests, cleaning, insulation/vacuum checks and operating documents as applicableState applicability, language, witness party, review points and final dossier index in the order
Packing and transportConfirm final envelope, net/shipping weight, centre of gravity, lifting points, supports, preservation, packing and loose-item listAgree port/road limits, shipping sections, handling equipment, delivery terms and transfer of risk for the project
Site work and local complianceOverseas design, erection, piping, commissioning, inspection and turnkey requirements can be proposed and confirmed with qualified responsible parties for the actual scopeEquipment supply does not automatically include civil/fire/power works, permitting, medical-system validation or a complete station performance guarantee

Evidence to check before order release

Confirm the proposed actual manufacturer, its current applicable credentials and scope, relevant equipment records, inspection plan and agreed sample dossier. Reference images show general manufacturing context only; specialist and joint supply retain the actual maker's identity.

Published fabrication and inspection evidence →

Continue with the corresponding equipment or package

Selection and scope guide · Destination code, inspection and documentation inputs · Ask for a quote with the files you have

RFQ WORKSHEET

Cryogenic tank and gas supply RFQ

Fill in known conditions only. Attach your existing drawing, equipment list or specification; we can help clarify the rest.

Include refill intervals and gas-flow units / reference conditions to relate inventory to vaporization duty. Oxygen cleanliness, nitrogen / argon purity, LNG composition / boil-off and CO2 phase control are reviewed for the service. For ethylene, ethane, atmospheric tanks, medical LOX and accessories, specify the service state, destination and responsibility boundaries separately.

Download RFQ worksheet (Excel, Chinese + English)

No registration needed. Return the completed file through the inquiry form or email chenlei@cnhuawang.com.

PROJECT INQUIRY

Request a tank, equipment package or site supply scope