  • Liquid ethylene storage for chemical plants
  • Cryogenic feedstock transfer and supply
  • Replacement equipment and project support

SUPPLY SCOPE

What you can request from Huawang

  • Request a single tank, multiple units or a storage-to-use equipment package
  • Optional vaporizers, pressure regulation and metering skids, valve groups and cryogenic piping can be included in the RFQ
  • For a gas supply station, include unloading, storage, vaporization, gas delivery and installation / commissioning requirements

Huawang organizes tank and gas supply packages. The quotation identifies in-house fabrication, specialist sourcing, joint supply and integration scope, together with equipment sources and site-service responsibilities.

RFQ INPUT

Start a quotation with the information you have

Send the conditions, datasheet, sketch or equipment list you already have. We will help confirm the missing information.
  • Medium, purity, application and storage state; inventory or usable capacity and quantity
  • Normal consumption, peak flow, delivery pressure and continuous-operation requirements
  • Operating and design pressure / temperature, insulation arrangement, connections and gas-quality requirements
  • Ambient conditions, available heat source and power, and standby requirements
  • Installation location, layout constraints, destination requirements, transport and requested delivery date

SELECTION & INTERFACES

Conditions that shape equipment and quotation

  • Define ethylene composition, phase, design temperature and pressure; do not substitute LNG or atmospheric-gas tank selections
  • Review cryogenic materials, insulation, leak control and transfer connections against project documents
  • Identify hazardous-area requirements, site conditions and the safety / control requirements supplied by the design party

MANUFACTURING & DOCUMENTS

Manufacturing and delivery documents

Huawang has in-house manufacturing experience in liquid ethylene storage equipment. Fabrication and package supply are defined by the design conditions, materials and insulation arrangement. Project documentation can include approved drawings, material traceability, welding inspection and agreed delivery records.

  • Request the proposed manufacturer's current applicable credentials and the agreed design / drawing list
  • Confirm material traceability, welding / NDE records, pressure and leak tests, and inspection witnessing as applicable
  • For the agreed cryogenic scope, include insulation / vacuum checks where applicable, cleaning records and operating / commissioning documents
Review the published fabrication and inspection chain →

RELATED PROCUREMENT

Related equipment and supply paths

EXPORT PROCUREMENT

Liquid Ethylene Storage & Supporting Equipment

Prepare an ethylene-storage RFQ from composition, storage state and process interfaces. It may include the tank, pump, insulated piping and agreed handling equipment. Issue separate datasheets for ethylene, ethane and LNG; also distinguish atmospheric storage from pressure vessels and assign design, fabrication and site duties accordingly.
Purchase conditions and supply interfaces
Purchase itemConditions to provideSupply and responsibility boundary
Medium and stateEthylene composition, impurities, operating temperature/pressure and inventoryProcess design establishes the storage and handling basis
Process interfacesFeed/withdrawal, flow, recycle/circulation and boil-off/recovery destinationConfirm pump, control, insulation and interface responsibilities
Project boundaryShop delivery/site erection, hazardous-area and utility requirementsEquipment supply does not establish complete plant process performance

Conceptual equipment sequence

Purchasing sequence only, not a P&ID or construction drawing. Confirm process, safety and control design for the actual site.

  1. 1Ethylene feed
  2. 2Project-defined cryogenic storage
  3. 3Pumping / transfer equipment
  4. 4Downstream process interface

Send the information already available

  • Process datasheets, composition, inventory and design conditions
  • Equipment list, control interfaces and cryogenic piping scope
  • Site country, inspection requirements, transport and schedule
  • Include installation country/site, medium, capacity or flow with unit basis, operating/design pressure and temperature, quantity, destination requirements, optional equipment, requested date and transport constraints. Mark unknown items as open; send the existing specification, drawing or equipment list first.

Manufacturing, documents and delivery agreement

Confirm each role and deliverable in the quotation
Purchase itemConditions to provideSupply and responsibility boundary
Equipment originIdentify tank fabrication within the accepted scope and each vaporizer, pump or valve train as in-house, specialist-sourced, jointly manufactured or integratedThe quotation identifies actual makers, applicable credentials and responsibilities; a requested destination approval is not an existing certification
Inspection and documentsAgree datasheets, interface drawings, ITP, material/welding/NDE records, tests, cleaning, insulation/vacuum checks and operating documents as applicableState applicability, language, witness party, review points and final dossier index in the order
Packing and transportConfirm final envelope, net/shipping weight, centre of gravity, lifting points, supports, preservation, packing and loose-item listAgree port/road limits, shipping sections, handling equipment, delivery terms and transfer of risk for the project
Site work and local complianceOverseas design, erection, piping, commissioning, inspection and turnkey requirements can be proposed and confirmed with qualified responsible parties for the actual scopeEquipment supply does not automatically include civil/fire/power works, permitting, medical-system validation or a complete station performance guarantee

Evidence to check before order release

Confirm the proposed actual manufacturer, its current applicable credentials and scope, relevant equipment records, inspection plan and agreed sample dossier. Reference images show general manufacturing context only; specialist and joint supply retain the actual maker's identity.

Published fabrication and inspection evidence →

Continue with the corresponding equipment or package

Selection and scope guide · Destination code, inspection and documentation inputs · Ask for a quote with the files you have

RFQ WORKSHEET

Cryogenic tank and gas supply RFQ

Fill in known conditions only. Attach your existing drawing, equipment list or specification; we can help clarify the rest.

Include refill intervals and gas-flow units / reference conditions to relate inventory to vaporization duty. Oxygen cleanliness, nitrogen / argon purity, LNG composition / boil-off and CO2 phase control are reviewed for the service. For ethylene, ethane, atmospheric tanks, medical LOX and accessories, specify the service state, destination and responsibility boundaries separately.

Download RFQ worksheet (Excel, Chinese + English)

No registration needed. Return the completed file through the inquiry form or email chenlei@cnhuawang.com.

PROJECT INQUIRY

Request a tank, equipment package or site supply scope

Start with the equipment, duty, quantity, installation location and schedule. Upload the available specifications; the sales team can help complete missing inputs.