菏泽花王 SINCE 1984

LPG & CRYOGENIC EXPORT PROCUREMENT

LNG Storage Tanks & Regasification Procurement

Order an LNG tank alone or list unloading, storage, regasification, reheating, pressure regulation, metering and project-required odorization as a package. Distinguish a pressurized vacuum-insulated tank from large atmospheric storage before confirming gas composition, boil-off handling and delivery duty. LNG and LPG are different services; do not copy storage construction, equipment or control conditions between them.

Huawang workshop reference, not a specific product or project delivery

Heze Huawang Pressure Vessel Co., Ltd. is a pressure-vessel and process-equipment manufacturer in Heze, Shandong, China. This procurement scope combines the accepted fabrication boundary with identified specialist supply, joint manufacturing and integration where required.

EXPORT PROCUREMENT

LNG Storage Tanks & Regasification Procurement

Purchase conditions and supply interfaces
Purchase itemConditions to provideSupply and responsibility boundary
Tank constructionPressurized/atmospheric type, capacity, liquid-level range and operating/design conditionsAgree construction, shop fabrication/site erection and inspection boundaries
RegasificationLNG composition, average/peak flow, outlet temperature/pressure, heat source and ambientSize vaporization, reheating and standby against the project duty
Boil-off and downstreamRefilling, shutdown, boil-off destination, metering basis and odorization requirementAssign boil-off, controls and local gas-network design responsibility

Conceptual equipment sequence

Purchasing sequence only, not a P&ID or construction drawing. Confirm process, safety and control design for the actual site.

  1. 1LNG unloading
  2. 2Cryogenic storage and boil-off interface
  3. 3Regasification and reheating
  4. 4Regulation/metering/required odorization and gas supply

Send the information already available

  • Tank specification, gas-flow units/reference conditions, operating hours and quantity
  • Unloading interface, heat/power, boil-off and regulation/metering/odorization list
  • Country/site, destination documents, transport limits and delivery time
  • Include installation country/site, medium, capacity or flow with unit basis, operating/design pressure and temperature, quantity, destination requirements, optional equipment, requested date and transport constraints. Mark unknown items as open; send the existing specification, drawing or equipment list first.

Manufacturing, documents and delivery agreement

Confirm each role and deliverable in the quotation
Purchase itemConditions to provideSupply and responsibility boundary
Equipment originIdentify tank fabrication within the accepted scope and each vaporizer, pump or valve train as in-house, specialist-sourced, jointly manufactured or integratedThe quotation identifies actual makers, applicable credentials and responsibilities; a requested destination approval is not an existing certification
Inspection and documentsAgree datasheets, interface drawings, ITP, material/welding/NDE records, tests, cleaning, insulation/vacuum checks and operating documents as applicableState applicability, language, witness party, review points and final dossier index in the order
Packing and transportConfirm final envelope, net/shipping weight, centre of gravity, lifting points, supports, preservation, packing and loose-item listAgree port/road limits, shipping sections, handling equipment, delivery terms and transfer of risk for the project
Site work and local complianceOverseas design, erection, piping, commissioning, inspection and turnkey requirements can be proposed and confirmed with qualified responsible parties for the actual scopeEquipment supply does not automatically include civil/fire/power works, permitting, medical-system validation or a complete station performance guarantee

Evidence to check before order release

Confirm the proposed actual manufacturer, its current applicable credentials and scope, relevant equipment records, inspection plan and agreed sample dossier. Reference images show general manufacturing context only; specialist and joint supply retain the actual maker's identity.

Published fabrication and inspection evidence →

Continue with the corresponding equipment or package

Selection and scope guide · Destination code, inspection and documentation inputs · Ask for a quote with the files you have

RFQ WORKSHEET

Cryogenic tank and gas supply RFQ

Fill in known conditions only. Attach your existing drawing, equipment list or specification; we can help clarify the rest.

Include refill intervals and gas-flow units / reference conditions to relate inventory to vaporization duty. Oxygen cleanliness, nitrogen / argon purity, LNG composition / boil-off and CO2 phase control are reviewed for the service. For ethylene, ethane, atmospheric tanks, medical LOX and accessories, specify the service state, destination and responsibility boundaries separately.

Download RFQ worksheet (Excel, Chinese + English)

No registration needed. Return the completed file through the inquiry form or email chenlei@cnhuawang.com.

PROJECT INQUIRY

One item, an equipment combination or a project package

Start with the files and conditions you have. Sales can clarify missing items; destination approvals, performance, lead time and site services need a project-specific agreement.

chenlei@cnhuawang.com