LPG & CRYOGENIC EXPORT PROCUREMENT
LNG Storage Tanks & Regasification Procurement
Order an LNG tank alone or list unloading, storage, regasification, reheating, pressure regulation, metering and project-required odorization as a package. Distinguish a pressurized vacuum-insulated tank from large atmospheric storage before confirming gas composition, boil-off handling and delivery duty. LNG and LPG are different services; do not copy storage construction, equipment or control conditions between them.

Heze Huawang Pressure Vessel Co., Ltd. is a pressure-vessel and process-equipment manufacturer in Heze, Shandong, China. This procurement scope combines the accepted fabrication boundary with identified specialist supply, joint manufacturing and integration where required.
EXPORT PROCUREMENT
LNG Storage Tanks & Regasification Procurement
| Purchase item | Conditions to provide | Supply and responsibility boundary |
|---|---|---|
| Tank construction | Pressurized/atmospheric type, capacity, liquid-level range and operating/design conditions | Agree construction, shop fabrication/site erection and inspection boundaries |
| Regasification | LNG composition, average/peak flow, outlet temperature/pressure, heat source and ambient | Size vaporization, reheating and standby against the project duty |
| Boil-off and downstream | Refilling, shutdown, boil-off destination, metering basis and odorization requirement | Assign boil-off, controls and local gas-network design responsibility |
Conceptual equipment sequence
Purchasing sequence only, not a P&ID or construction drawing. Confirm process, safety and control design for the actual site.
- 1LNG unloading
- 2Cryogenic storage and boil-off interface
- 3Regasification and reheating
- 4Regulation/metering/required odorization and gas supply
Send the information already available
- Tank specification, gas-flow units/reference conditions, operating hours and quantity
- Unloading interface, heat/power, boil-off and regulation/metering/odorization list
- Country/site, destination documents, transport limits and delivery time
- Include installation country/site, medium, capacity or flow with unit basis, operating/design pressure and temperature, quantity, destination requirements, optional equipment, requested date and transport constraints. Mark unknown items as open; send the existing specification, drawing or equipment list first.
Manufacturing, documents and delivery agreement
| Purchase item | Conditions to provide | Supply and responsibility boundary |
|---|---|---|
| Equipment origin | Identify tank fabrication within the accepted scope and each vaporizer, pump or valve train as in-house, specialist-sourced, jointly manufactured or integrated | The quotation identifies actual makers, applicable credentials and responsibilities; a requested destination approval is not an existing certification |
| Inspection and documents | Agree datasheets, interface drawings, ITP, material/welding/NDE records, tests, cleaning, insulation/vacuum checks and operating documents as applicable | State applicability, language, witness party, review points and final dossier index in the order |
| Packing and transport | Confirm final envelope, net/shipping weight, centre of gravity, lifting points, supports, preservation, packing and loose-item list | Agree port/road limits, shipping sections, handling equipment, delivery terms and transfer of risk for the project |
| Site work and local compliance | Overseas design, erection, piping, commissioning, inspection and turnkey requirements can be proposed and confirmed with qualified responsible parties for the actual scope | Equipment supply does not automatically include civil/fire/power works, permitting, medical-system validation or a complete station performance guarantee |
Evidence to check before order release
Confirm the proposed actual manufacturer, its current applicable credentials and scope, relevant equipment records, inspection plan and agreed sample dossier. Reference images show general manufacturing context only; specialist and joint supply retain the actual maker's identity.
Published fabrication and inspection evidence →Continue with the corresponding equipment or package
LNG Storage, Regasification & Gas Delivery Packages
Organize an LNG package along unloading, storage, boil-off interfaces, regasification, reheating and regulation/metering.
Cryogenic Vaporizers & Reheating Equipment
Quote a vaporizer from the actual medium, liquid inlet state, average/peak flow, outlet temperature/pressure and continuous operating period.
Gas Pressure Regulation & Metering Skids
Start a regulation/metering RFQ with the gas inlet range, required outlet pressure, average/peak flow and metering reference basis.
Large Atmospheric Cryogenic Flat-Bottom Tanks
Large atmospheric cryogenic flat-bottom tanks have a different procurement and construction scope from pressurized cryogenic vessels.
Selection and scope guide · Destination code, inspection and documentation inputs · Ask for a quote with the files you have
RFQ WORKSHEET
Cryogenic tank and gas supply RFQ
Fill in known conditions only. Attach your existing drawing, equipment list or specification; we can help clarify the rest.Include refill intervals and gas-flow units / reference conditions to relate inventory to vaporization duty. Oxygen cleanliness, nitrogen / argon purity, LNG composition / boil-off and CO2 phase control are reviewed for the service. For ethylene, ethane, atmospheric tanks, medical LOX and accessories, specify the service state, destination and responsibility boundaries separately.
Download RFQ worksheet (Excel, Chinese + English)No registration needed. Return the completed file through the inquiry form or email chenlei@cnhuawang.com.
PROJECT INQUIRY
One item, an equipment combination or a project package
Start with the files and conditions you have. Sales can clarify missing items; destination approvals, performance, lead time and site services need a project-specific agreement.