菏泽花王 SINCE 1984

EQUIPMENT & PROJECT SUPPLY

Liquid CO2 Storage Tank & Vaporization Supply

Single liquid carbon dioxide tanks or storage-to-gas equipment packages, with vaporization, transfer, pressure regulation and metering scope.

Vertical storage vessel transportation (reference scene)
Vertical storage vessel transportation (reference scene)

RFQ WORKSHEET

Cryogenic tank and gas supply RFQ

Fill in known conditions only. Attach your existing drawing, equipment list or specification; we can help clarify the rest.

Include refill intervals and gas-flow units / reference conditions to relate inventory to vaporization duty. Oxygen cleanliness, nitrogen / argon purity, LNG composition / boil-off and CO2 phase control are reviewed for the service. For ethylene, ethane, atmospheric tanks, medical LOX and accessories, specify the service state, destination and responsibility boundaries separately.

Download RFQ worksheet (Excel, Chinese + English)

No registration needed. Return the completed file through the inquiry form or email chenlei@cnhuawang.com.

APPLICATIONS

Equipment duty and applications

  • Central industrial carbon dioxide supply
  • Welding and process-gas support
  • Liquid CO2 storage, transfer and vaporization

SUPPLY SCOPE

What you can request from Huawang

  • Request a single tank, multiple units or a storage-to-use equipment package
  • Optional vaporizers, pressure regulation and metering skids, valve groups and cryogenic piping can be included in the RFQ
  • For a gas supply station, include unloading, storage, vaporization, gas delivery and installation / commissioning requirements

Huawang organizes tank and gas supply packages. The quotation identifies in-house fabrication, specialist sourcing, joint supply and integration scope, together with equipment sources and site-service responsibilities.

PROJECT PACKAGE

From tank to CO2 equipment package

  • A tank can be quoted separately from the storage and vaporization package. Identify vaporization, regulation, metering, valve groups and site-work requirements.
Review cryogenic equipment-package supply →

RFQ INPUT

Start a quotation with the information you have

Send the conditions, datasheet, sketch or equipment list you already have. We will help confirm the missing information.
  • Medium, purity, application and storage state; inventory or usable capacity and quantity
  • Normal consumption, peak flow, delivery pressure and continuous-operation requirements
  • Operating and design pressure / temperature, insulation arrangement, connections and gas-quality requirements
  • Ambient conditions, available heat source and power, and standby requirements
  • Installation location, layout constraints, destination requirements, transport and requested delivery date

SELECTION & INTERFACES

Conditions that shape equipment and quotation

  • Specify liquid CO2 purity, storage conditions and downstream duty so equipment is selected for the intended phase
  • Define insulation, refrigeration or other pressure / temperature control in the design; the gas name does not imply vacuum construction
  • Include vaporizer heat source, transfer method, shutdown conditions and safety accessories in the equipment list

MANUFACTURING & DOCUMENTS

Manufacturing and delivery documents

Huawang has a manufacturing foundation in liquid CO2 pressure-vessel bodies and can fabricate to approved drawings, coordinating insulation, vaporization, valves and instruments. Material traceability, welding inspection and delivery records are supplied to the project document list.

  • Request the proposed manufacturer's current applicable credentials and the agreed design / drawing list
  • Confirm material traceability, welding / NDE records, pressure and leak tests, and inspection witnessing as applicable
  • For the agreed cryogenic scope, include insulation / vacuum checks where applicable, cleaning records and operating / commissioning documents
Review the published fabrication and inspection chain →

RELATED PROCUREMENT

Related equipment and supply paths

EXPORT PROCUREMENT

Liquid CO2 Storage & Supply

Specify CO2 source quality, refill state, storage pressure/temperature and required outlet phase. Combine the tank, refrigeration or pressure management, pumps and vaporizers against the actual duty. Separate food/beverage, industrial or other gas-quality obligations from equipment supply; do not copy oxygen/nitrogen/argon conditions.

Conceptual equipment sequence

Purchasing sequence only, not a P&ID or construction drawing. Confirm process, safety and control design for the actual site.

  1. 1Liquid CO2 refill
  2. 2Controlled storage
  3. 3Pumping or vaporized supply
  4. 4Agreed quality and user interface
Purchase conditions and supply interfaces
Purchase itemConditions to provideSupply and responsibility boundary
Storage stateRefill temperature/pressure, inventory range, ambient and shutdown cycleReview configuration and instruments against phase and pressure management
Outlet dutyLiquid withdrawal or gas flow, pressure, temperature and continuous dutyDistinguish pump, vaporizer and reheater duties
QualityApplication, purity/impurity limits, cleaning and samplingEquipment material or tank name is not gas-quality evidence

Send the information already available

  • Liquid CO2 source, composition, refill conditions and demand
  • Inventory/quantity, operating/design basis and site utilities
  • Required refrigeration, pumping, vaporization, metering and documents
  • Include installation country/site, medium, capacity or flow with unit basis, operating/design pressure and temperature, quantity, destination requirements, optional equipment, requested date and transport constraints. Mark unknown items as open; send the existing specification, drawing or equipment list first.

Manufacturing, documents and delivery agreement

Confirm each role and deliverable in the quotation
Purchase itemConditions to provideSupply and responsibility boundary
Equipment originIdentify tank fabrication within the accepted scope and each vaporizer, pump or valve train as in-house, specialist-sourced, jointly manufactured or integratedThe quotation identifies actual makers, applicable credentials and responsibilities; a requested destination approval is not an existing certification
Inspection and documentsAgree datasheets, interface drawings, ITP, material/welding/NDE records, tests, cleaning, insulation/vacuum checks and operating documents as applicableState applicability, language, witness party, review points and final dossier index in the order
Packing and transportConfirm final envelope, net/shipping weight, centre of gravity, lifting points, supports, preservation, packing and loose-item listAgree port/road limits, shipping sections, handling equipment, delivery terms and transfer of risk for the project
Site work and local complianceOverseas design, erection, piping, commissioning, inspection and turnkey requirements can be proposed and confirmed with qualified responsible parties for the actual scopeEquipment supply does not automatically include civil/fire/power works, permitting, medical-system validation or a complete station performance guarantee

Evidence to check before order release

Confirm the proposed actual manufacturer, its current applicable credentials and scope, relevant equipment records, inspection plan and agreed sample dossier. Reference images show general manufacturing context only; specialist and joint supply retain the actual maker's identity.

Published fabrication and inspection evidence →

Continue with the corresponding equipment or package

Selection and scope guide · Destination code, inspection and documentation inputs · Ask for a quote with the files you have

PROJECT INQUIRY

Request a tank, equipment package or site supply scope

Start with the equipment, duty, quantity, installation location and schedule. Upload the available specifications; the sales team can help complete missing inputs.