菏泽花王 SINCE 1984

LPG & CRYOGENIC EXPORT PROCUREMENT

Skid-Mounted LPG Cylinder Filling Station

For bottled-gas operators, LPG distributors and small or medium cylinder-filling businesses, this package organizes storage, unloading, liquid transfer and electronic-weighing filling as modular equipment. The tank and filling equipment may be supplied on one skid, separate skids or transport modules, with interfaces defined for one tank, multiple tanks or staged expansion. Huawang identifies tank fabrication, specialist sourcing, joint manufacture and system integration for the actual project. Vaporized gas supply and vehicle refuelling are different duties and are not included by default.

Huawang workshop reference, not a specific product or project delivery

Heze Huawang Pressure Vessel Co., Ltd. is a pressure-vessel and process-equipment manufacturer in Heze, Shandong, China. This procurement scope combines the accepted fabrication boundary with identified specialist supply, joint manufacturing and integration where required.

EXPORT PROCUREMENT

Skid-Mounted LPG Cylinder Filling Station

Purchase conditions and supply interfaces
Purchase itemConditions to provideSupply and responsibility boundary
Storage and expansionLPG composition, volume and quantity per tank, refill frequency, current and staged filling demandProject conditions define one or multiple tanks, future tie-ins and changeover logic; equipment models follow inventory, filling demand and site conditions
Road-tanker unloadingRoad-tanker conditions, unloading method, time window, existing equipment and interfacesAn LPG-service compressor is included only when required by the selected unloading method; instrument air separately supplies clean utility air to pneumatic devices
Liquid transferFilling flow, inlet conditions, piping loss, recycle, operating mode and standby needsThe hydrocarbon/liquid pump feeds the filling manifold; the actual maker confirms performance and suitability
Cylinder fillingCylinder sizes, valve connection, net fill mass, number of stations and manual or semi-automatic operationScales, connectors, controls and filling capacity are confirmed from cylinder specifications, demand and project conditions
Auxiliary and protective equipmentCheck weighing, leak testing, conveyors, residual recovery, gas detection, emergency shutdown, controls and instrument airList each required item in the equipment schedule; instrument air is a separate utility and does not transfer LPG
Preassembly and deliverySingle/separate skids, transport envelope and weight, lifting, split points, site conditions and service scopePreassemble and inspect within practical limits; assign foundations, field piping, electrical/instrument connections, commissioning and local approvals line by line

ORIGINAL PROCUREMENT COMPOSITION

01

Road-tanker unloading

Use an LPG-service unloading compressor only when the selected tanker and unloading method require it. This is not the instrument-air compressor.

02

LPG storage

One or more pressure tanks, accessories and isolation/changeover interfaces are defined from inventory, refill frequency and expansion stages.

03

Liquid transfer

A hydrocarbon/liquid pump feeds the filling manifold. Inlet conditions, recycle, standby and the actual pump maker are confirmed for the duty.

04

Cylinder filling

Electronic scales, filling connectors and controls are selected from cylinder size, valve connection, net fill mass, stations and operating method.

Protective controls

Gas detection, emergency shutdown, valves, instruments and electrical control are assigned against the actual design.

Instrument air utility

Where pneumatic devices need instrument air, provide it as a separate clean utility; it does not unload or transfer LPG.

Optional downstream equipment

Check weighing, leak testing, conveyors and residual recovery are added only when requested and technically defined.

Conceptual purchasing diagram only. It is not a P&ID, construction drawing or evidence of a delivered complete plant. Process, safety, layout, performance and local approvals require project-specific confirmation.

Conceptual equipment sequence

Purchasing sequence only, not a P&ID or construction drawing. Confirm process, safety and control design for the actual site.

  1. 1Road-tanker refill and optional unloading equipment
  2. 2Single or multiple LPG tanks
  3. 3Liquid pumping and recycle protection
  4. 4Electronic-weighing cylinder filling stations
  5. 5Check weighing, leak testing and downstream conveying as required

Send the information already available

  • LPG medium, composition and supply-source conditions
  • Planned daily and hourly filling demand, units and operating shifts
  • Cylinder sizes, valve connection, net fill mass and available sample-cylinder information
  • Tank volume, quantity, refill frequency and staged expansion plan
  • Road-tanker unloading conditions, time window and existing pump/compressor/interfaces
  • Number of filling stations, manual or semi-automatic mode, check weighing/leak testing/conveyor needs
  • Power, instrument air, earthing and control-interface utilities
  • Installation country, site, transport/handling limits and equipment/document/site-service scope
  • Include installation country/site, medium, capacity or flow with unit basis, operating/design pressure and temperature, quantity, destination requirements, optional equipment, requested date and transport constraints. Mark unknown items as open; send the existing specification, drawing or equipment list first.

Manufacturing, documents and delivery agreement

Confirm each role and deliverable in the quotation
Purchase itemConditions to provideSupply and responsibility boundary
Equipment originIdentify tank fabrication within the accepted scope and each vaporizer, pump or valve train as in-house, specialist-sourced, jointly manufactured or integratedThe quotation identifies actual makers, applicable credentials and responsibilities; a requested destination approval is not an existing certification
Inspection and documentsAgree datasheets, interface drawings, ITP, material/welding/NDE records, tests, cleaning, insulation/vacuum checks and operating documents as applicableState applicability, language, witness party, review points and final dossier index in the order
Packing and transportConfirm final envelope, net/shipping weight, centre of gravity, lifting points, supports, preservation, packing and loose-item listAgree port/road limits, shipping sections, handling equipment, delivery terms and transfer of risk for the project
Site work and local complianceOverseas design, erection, piping, commissioning, inspection and turnkey requirements can be proposed and confirmed with qualified responsible parties for the actual scopeEquipment supply does not automatically include civil/fire/power works, permitting, medical-system validation or a complete station performance guarantee

Evidence to check before order release

Confirm the proposed actual manufacturer, its current applicable credentials and scope, relevant equipment records, inspection plan and agreed sample dossier. Reference images show general manufacturing context only; specialist and joint supply retain the actual maker's identity.

Published fabrication and inspection evidence →

Continue with the corresponding equipment or package

Selection and scope guide · Destination code, inspection and documentation inputs · Ask for a quote with the files you have

RFQ WORKSHEET

LPG tank and station equipment RFQ

Fill in known conditions only. Attach your existing drawing, equipment list or specification; we can help clarify the rest.

Request an LPG tank, tank equipment package or liquid-phase cylinder-filling skid. Cylinder filling, vaporized gas supply and vehicle refuelling are different duties. Installation, commissioning and site services are agreed for the location, local conditions and equipment list, with design, civil, utility and site responsibilities identified in the quotation.

Download RFQ worksheet (Excel, Chinese + English)

No registration needed. Return the completed file through the inquiry form or email chenlei@cnhuawang.com.

PROJECT INQUIRY

One item, an equipment combination or a project package

Start with the files and conditions you have. Sales can clarify missing items; destination approvals, performance, lead time and site services need a project-specific agreement.

chenlei@cnhuawang.com