LPG Storage, Transfer & Station Equipment Packages

Request an LPG project as individual/multiple tanks, storage/transfer equipment combinations or a station equipment package. Break tank inventory, unloading cycles, liquid/gas output, vaporization/regulation and station controls into a list, then identify Huawang fabrication, specialist sourcing, integration and overseas site work. Multi-tank and station projects need a design basis and responsibility matrix; an equipment list is not a turnkey commitment.

Huawang workshop reference, not a specific product or project delivery

Heze Huawang Pressure Vessel Co., Ltd. is a pressure-vessel and process-equipment manufacturer in Heze, Shandong, China. This procurement scope combines the accepted fabrication boundary with identified specialist supply, joint manufacturing and integration where required.

EXPORT PROCUREMENT

LPG Storage, Transfer & Station Equipment Packages

Purchase conditions and supply interfaces
Purchase itemConditions to provideSupply and responsibility boundary
Tank levelVolume/quantity per tank, arrangement, accessories and stagingConfirm each tank and its manufacturing/inspection dossier
Equipment combinationUnloading, pump/compressor, vaporizer, regulation/metering and valvesList specialist makers, preassembly, tests and skid-edge interfaces
Station scopeLayout, piping, electrical/fire systems, controls, erection/start-up and local approvalsWhere requested, separately confirm scope, responsible parties, local qualifications and acceptance

Conceptual equipment sequence

Purchasing sequence only, not a P&ID or construction drawing. Confirm process, safety and control design for the actual site.

  1. 1Refill / unloading
  2. 2Single or multiple tanks
  3. 3Transfer or vaporization/regulation/metering
  4. 4Station and user interfaces

Send the information already available

  • LPG composition/refilling, inventory per tank and liquid/gas output duty
  • Equipment tags/quantity, P&ID/layout and instrument/interlock requirements
  • Country, delivery terms, inspection, spares, documents and schedule
  • Include installation country/site, medium, capacity or flow with unit basis, operating/design pressure and temperature, quantity, destination requirements, optional equipment, requested date and transport constraints. Mark unknown items as open; send the existing specification, drawing or equipment list first.

Manufacturing, documents and delivery agreement

Confirm each role and deliverable in the quotation
Purchase itemConditions to provideSupply and responsibility boundary
Equipment originIdentify tank fabrication within the accepted scope and each vaporizer, pump or valve train as in-house, specialist-sourced, jointly manufactured or integratedThe quotation identifies actual makers, applicable credentials and responsibilities; a requested destination approval is not an existing certification
Inspection and documentsAgree datasheets, interface drawings, ITP, material/welding/NDE records, tests, cleaning, insulation/vacuum checks and operating documents as applicableState applicability, language, witness party, review points and final dossier index in the order
Packing and transportConfirm final envelope, net/shipping weight, centre of gravity, lifting points, supports, preservation, packing and loose-item listAgree port/road limits, shipping sections, handling equipment, delivery terms and transfer of risk for the project
Site work and local complianceOverseas design, erection, piping, commissioning, inspection and turnkey requirements can be proposed and confirmed with qualified responsible parties for the actual scopeEquipment supply does not automatically include civil/fire/power works, permitting, medical-system validation or a complete station performance guarantee

Evidence to check before order release

Confirm the proposed actual manufacturer, its current applicable credentials and scope, relevant equipment records, inspection plan and agreed sample dossier. Reference images show general manufacturing context only; specialist and joint supply retain the actual maker's identity.

Published fabrication and inspection evidence →

Continue with the corresponding equipment or package

Selection and scope guide · Destination code, inspection and documentation inputs · Ask for a quote with the files you have

RFQ WORKSHEET

LPG tank and station equipment RFQ

Fill in known conditions only. Attach your existing drawing, equipment list or specification; we can help clarify the rest.

Request an LPG tank, tank equipment package or liquid-phase cylinder-filling skid. Cylinder filling, vaporized gas supply and vehicle refuelling are different duties. Installation, commissioning and site services are agreed for the location, local conditions and equipment list, with design, civil, utility and site responsibilities identified in the quotation.

Download RFQ worksheet (Excel, Chinese + English)

No registration needed. Return the completed file through the inquiry form or email chenlei@cnhuawang.com.

PROJECT INQUIRY

One item, an equipment combination or a project package

Start with the files and conditions you have. Sales can clarify missing items; destination approvals, performance, lead time and site services need a project-specific agreement.