菏泽花王 SINCE 1984

LPG & CRYOGENIC EXPORT PROCUREMENT

Liquid CO2 Storage, Transfer & Gas Supply Packages

Start a CO2 package with the liquid source, refilling and controlled storage, adding pumping, vaporization, reheating and regulation/metering for the required liquid or gas outlet. The actual design basis establishes pressure/temperature, phase management and refrigeration or pressure-maintenance requirements. Assign gas purity/use, equipment cleaning and downstream process or food-quality validation separately; package supply does not combine them into one guarantee.

Huawang workshop reference, not a specific product or project delivery

Heze Huawang Pressure Vessel Co., Ltd. is a pressure-vessel and process-equipment manufacturer in Heze, Shandong, China. This procurement scope combines the accepted fabrication boundary with identified specialist supply, joint manufacturing and integration where required.

EXPORT PROCUREMENT

Liquid CO2 Storage, Transfer & Gas Supply Packages

Purchase conditions and supply interfaces
Purchase itemConditions to provideSupply and responsibility boundary
Storage managementRefill state, inventory, ambient, shutdown and pressure managementConfirm tank, refrigeration and protective controls against duty
Liquid / gas deliveryPump or gas flow, outlet temperature/pressure and continuous dutyIdentify suppliers of pumps, vaporization/reheating and metering
Quality and interfacesUse, purity, impurities, cleaning and downstream samplingSeparate equipment tests, gas quality and process validation

Conceptual equipment sequence

Purchasing sequence only, not a P&ID or construction drawing. Confirm process, safety and control design for the actual site.

  1. 1Liquid CO2 refill
  2. 2Controlled storage/pressure management
  3. 3Liquid transfer or vaporization/reheating
  4. 4Quality and user interface

Send the information already available

  • CO2 source/composition, refill duty and inventory/quantity
  • Liquid/gas use, consumption/peak, outlet requirements and utilities
  • Country, documents, controls, spares, transport and schedule
  • Include installation country/site, medium, capacity or flow with unit basis, operating/design pressure and temperature, quantity, destination requirements, optional equipment, requested date and transport constraints. Mark unknown items as open; send the existing specification, drawing or equipment list first.

Manufacturing, documents and delivery agreement

Confirm each role and deliverable in the quotation
Purchase itemConditions to provideSupply and responsibility boundary
Equipment originIdentify tank fabrication within the accepted scope and each vaporizer, pump or valve train as in-house, specialist-sourced, jointly manufactured or integratedThe quotation identifies actual makers, applicable credentials and responsibilities; a requested destination approval is not an existing certification
Inspection and documentsAgree datasheets, interface drawings, ITP, material/welding/NDE records, tests, cleaning, insulation/vacuum checks and operating documents as applicableState applicability, language, witness party, review points and final dossier index in the order
Packing and transportConfirm final envelope, net/shipping weight, centre of gravity, lifting points, supports, preservation, packing and loose-item listAgree port/road limits, shipping sections, handling equipment, delivery terms and transfer of risk for the project
Site work and local complianceOverseas design, erection, piping, commissioning, inspection and turnkey requirements can be proposed and confirmed with qualified responsible parties for the actual scopeEquipment supply does not automatically include civil/fire/power works, permitting, medical-system validation or a complete station performance guarantee

Evidence to check before order release

Confirm the proposed actual manufacturer, its current applicable credentials and scope, relevant equipment records, inspection plan and agreed sample dossier. Reference images show general manufacturing context only; specialist and joint supply retain the actual maker's identity.

Published fabrication and inspection evidence →

Continue with the corresponding equipment or package

Selection and scope guide · Destination code, inspection and documentation inputs · Ask for a quote with the files you have

RFQ WORKSHEET

Cryogenic tank and gas supply RFQ

Fill in known conditions only. Attach your existing drawing, equipment list or specification; we can help clarify the rest.

Include refill intervals and gas-flow units / reference conditions to relate inventory to vaporization duty. Oxygen cleanliness, nitrogen / argon purity, LNG composition / boil-off and CO2 phase control are reviewed for the service. For ethylene, ethane, atmospheric tanks, medical LOX and accessories, specify the service state, destination and responsibility boundaries separately.

Download RFQ worksheet (Excel, Chinese + English)

No registration needed. Return the completed file through the inquiry form or email chenlei@cnhuawang.com.

PROJECT INQUIRY

One item, an equipment combination or a project package

Start with the files and conditions you have. Sales can clarify missing items; destination approvals, performance, lead time and site services need a project-specific agreement.

chenlei@cnhuawang.com