DIRECT ANSWERA replacement-vessel survey must arrange safe access, isolation status, permits, escorts and measurement windows before the team arrives. State which dimensions remain concealed by insulation, piping or live equipment and who will expose them.
Survey readiness
- Area access, permits and induction
- Isolation, gas-free and opening authority
- Measurement tools, datum and escort
- Hidden interfaces and outage follow-up
Relevant manufacturing capability
- Drawing, datasheet and equipment-list manufacturability review
- Self-manufactured and coordinated-supply scope identification
- Technical, quality, document and delivery clarification
Key notes
- A measurement plan is not permission to open or enter equipment.
