Manufacturing & Inspection

Pressure-vessel fabrication, NDE and quality-control reference.

PUBLISHED ARTICLES

Published articles

Browse design, manufacturing and procurement guides for this topic.
Manufacturing & Inspection

Which NDE Methods Are Commonly Used on Pressure Vessels?

Record each weld or area on an inspection map linked to the approved NDE plan.

Read article →
Manufacturing & Inspection

When Should RT, UT, MT, PT or TOFD Be Used?

Use a joint-by-joint method and coverage schedule rather than a list of acronyms.

Read article →
Manufacturing & Inspection

What Must Be Confirmed Before a Vessel Hydrostatic Test?

Use a signed test record linked to the vessel identity and approved procedure.

Read article →
Manufacturing & Inspection

Buffer Vessel vs Gas-Liquid Separator: What Changes?

Issue a process duty sheet that states the required performance before mechanical design.

Read article →
Manufacturing & Inspection

How Are Pressure-Vessel Welded Joints Inspected?

Tie every inspected joint to the weld map, procedure and signed result.

Read article →
Manufacturing & Inspection

What Process Inputs Are Needed for a Gas-Liquid Separator?

Have process design issue the performance duty before mechanical quotation.

Read article →
Manufacturing & Inspection

How Is a Pressure-Vessel Inspection and Test Plan Prepared?

Approve the ITP before the first affected operation and track every release.

Read article →
Manufacturing & Inspection

What Should a Pressure-Vessel Factory Acceptance Review Cover?

Close or formally disposition every punch item before shipment authorization.

Read article →
Manufacturing & Inspection

What Documents Support Statutory or Supervisory Vessel Inspection?

Agree document access and submission milestones with the authorized inspection body.

Read article →
Manufacturing & Inspection

How Do Hold, Witness and Review Points Differ?

Put the definitions and release authority directly in the approved ITP.

Read article →
Manufacturing & Inspection

What Should Be Checked When a Pressure Vessel Arrives on Site?

Create a dated receipt record with photographs and disposition for every exception.

Read article →
Manufacturing & Inspection

How Should NCRs and Punch Items Be Closed?

Link closed issues to the final dossier and release decision.

Read article →
Manufacturing & Inspection

How Do WPS, PQR and Welder Qualifications Relate?

Map every production weld to an applicable WPS and qualified personnel.

Read article →
Manufacturing & Inspection

Whole-Vessel vs Local PWHT: What Is the Difference?

Approve a joint-by-joint heat-treatment plan before fabrication sequence is frozen.

Read article →
Manufacturing & Inspection

How Should Vessel Weld Repairs Be Controlled and Closed?

Close one traceable repair package per affected weld and incorporate it in the manufacturing dossier.

Read article →
Manufacturing & Inspection

Pressure, Tightness and Leak Tests: What Is the Difference?

Put each required test and acceptance basis on the ITP, including the order after repairs or assembly.

Read article →
Manufacturing & Inspection

Why Are Weld Maps Important for Vessel Traceability?

Reconcile the final map against the as-built drawing and dossier index before release.

Read article →

RELATED

Related products and manufacturing capability

PROJECT INQUIRY

Need to confirm a project requirement?

Send drawings, specifications, datasheets and available design conditions for a project-specific manufacturability assessment.