Manufacturing & Inspection
Pressure-vessel fabrication, NDE and quality-control reference.
PUBLISHED ARTICLES
Published articles
Browse design, manufacturing and procurement guides for this topic.Which NDE Methods Are Commonly Used on Pressure Vessels?
Record each weld or area on an inspection map linked to the approved NDE plan.
Read article →Manufacturing & InspectionWhen Should RT, UT, MT, PT or TOFD Be Used?
Use a joint-by-joint method and coverage schedule rather than a list of acronyms.
Read article →Manufacturing & InspectionWhat Must Be Confirmed Before a Vessel Hydrostatic Test?
Use a signed test record linked to the vessel identity and approved procedure.
Read article →Manufacturing & InspectionBuffer Vessel vs Gas-Liquid Separator: What Changes?
Issue a process duty sheet that states the required performance before mechanical design.
Read article →Manufacturing & InspectionHow Are Pressure-Vessel Welded Joints Inspected?
Tie every inspected joint to the weld map, procedure and signed result.
Read article →Manufacturing & InspectionWhat Process Inputs Are Needed for a Gas-Liquid Separator?
Have process design issue the performance duty before mechanical quotation.
Read article →Manufacturing & InspectionHow Is a Pressure-Vessel Inspection and Test Plan Prepared?
Approve the ITP before the first affected operation and track every release.
Read article →Manufacturing & InspectionWhat Should a Pressure-Vessel Factory Acceptance Review Cover?
Close or formally disposition every punch item before shipment authorization.
Read article →Manufacturing & InspectionWhat Documents Support Statutory or Supervisory Vessel Inspection?
Agree document access and submission milestones with the authorized inspection body.
Read article →Manufacturing & InspectionHow Do Hold, Witness and Review Points Differ?
Put the definitions and release authority directly in the approved ITP.
Read article →Manufacturing & InspectionWhat Should Be Checked When a Pressure Vessel Arrives on Site?
Create a dated receipt record with photographs and disposition for every exception.
Read article →Manufacturing & InspectionHow Should NCRs and Punch Items Be Closed?
Link closed issues to the final dossier and release decision.
Read article →Manufacturing & InspectionHow Do WPS, PQR and Welder Qualifications Relate?
Map every production weld to an applicable WPS and qualified personnel.
Read article →Manufacturing & InspectionWhole-Vessel vs Local PWHT: What Is the Difference?
Approve a joint-by-joint heat-treatment plan before fabrication sequence is frozen.
Read article →Manufacturing & InspectionHow Should Vessel Weld Repairs Be Controlled and Closed?
Close one traceable repair package per affected weld and incorporate it in the manufacturing dossier.
Read article →Manufacturing & InspectionPressure, Tightness and Leak Tests: What Is the Difference?
Put each required test and acceptance basis on the ITP, including the order after repairs or assembly.
Read article →Manufacturing & InspectionWhy Are Weld Maps Important for Vessel Traceability?
Reconcile the final map against the as-built drawing and dossier index before release.
Read article →RELATED
Related products and manufacturing capability
PROJECT INQUIRY
Need to confirm a project requirement?
Send drawings, specifications, datasheets and available design conditions for a project-specific manufacturability assessment.