What Should Be Checked When a Pressure Vessel Arrives on Site?

Create a dated receipt record with photographs and disposition for every exception.

DIRECT ANSWEROn arrival, verify identity and shipping documents, packaging and preservation, impact or deformation, nozzles and closures, loose items, supports, lifting damage and storage requirements.

Site receipt check

  • Tag, shipping list and release documents
  • Packing, seals, desiccants and preservation
  • Physical damage, supports, nozzles and attachments
  • Loose items, storage, claims and handover

Relevant manufacturing capability

  • Manufacturing-stage quality planning
  • Multi-method inspection and test coordination
  • Traceable release and manufacturing-dossier records

Key notes

  • Site acceptance of delivery is not final performance acceptance.

FAQ

Frequently asked questions

01What if transport damage is suspected?

Quarantine the affected item, preserve evidence and follow the contractual inspection and claim process.

RELATED

Related products and reference

PROJECT INQUIRY

Have a project? Send the drawings or technical conditions.

Send drawings, specifications, datasheets and design conditions for a manufacturability assessment based on the equipment type and project requirements.