菏泽花王 SINCE 1984

TECHNICAL REFERENCE

Can Fabrication or Shipment Continue with Open ITP Hold or Witness Points?

Use the register to gate the next fabrication or shipment activity.

DIRECT ANSWERAn ITP release register records each hold or witness point, notice, attendance or waiver, inspection result and authorized release. Work may continue only according to the approved ITP and contract rules for that point.

Release-register columns

  • Activity, tag and ITP reference
  • Point type and notified party
  • Notice time, attendance and result
  • Signed release or approved waiver

Relevant manufacturing capability

  • Drawing, datasheet and equipment-list manufacturability review
  • Self-manufactured and coordinated-supply scope identification
  • Technical, quality, document and delivery clarification

Key notes

  • An open hold point cannot be closed by an internal schedule note.

FAQ

Frequently asked questions

01What if a witness inspector does not attend?

Apply the documented notice and waiver procedure; do not assume that a missed witness automatically releases a hold point.

RELATED

Related products and reference

PROJECT INQUIRY

Have a project? Send the drawings or technical conditions.

Send drawings, specifications, datasheets and design conditions for a manufacturability assessment based on the equipment type and project requirements.