LPG & CRYOGENIC EXPORT PROCUREMENT
Large Atmospheric Cryogenic Storage & Site Interfaces
Define a large atmospheric cryogenic storage package from the design basis, site conditions and construction method. Huawang can propose the actual scope for prefabrication, joint manufacture, specialist equipment, erection coordination and system integration. Assign primary/containment and foundation design, insulation, pumps/boil-off, inspection and start-up separately. EPC or turnkey requirements can be proposed but are not established by an equipment quotation.

Heze Huawang Pressure Vessel Co., Ltd. is a pressure-vessel and process-equipment manufacturer in Heze, Shandong, China. This procurement scope combines the accepted fabrication boundary with identified specialist supply, joint manufacturing and integration where required.
EXPORT PROCUREMENT
Large Atmospheric Cryogenic Storage & Site Interfaces
| Purchase item | Conditions to provide | Supply and responsibility boundary |
|---|---|---|
| Design and site | Medium, scale, containment, design basis, geotechnical and ambient data | Verify applicable requirements, designer and site qualifications |
| Fabrication and erection | Prefabricated sections, material, welding, insulation, site assembly and inspection | Assign actual fabrication/construction responsibility by work package |
| Systems and handover | Boil-off, pumps, controls, utilities, tests and start-up | Agree functional validation, operating/maintenance records and local acceptance |
Conceptual equipment sequence
Purchasing sequence only, not a P&ID or construction drawing. Confirm process, safety and control design for the actual site.
- 1Basic design and package division
- 2Prefabrication and specialist equipment
- 3Site assembly and system tie-ins
- 4Agreed inspection, commissioning and handover
Send the information already available
- Basic design package, equipment list, drawings and interface matrix
- Fabrication location, erection resources, transport and heavy lifting
- Country, review/inspection plan, delivery and service requirements
- Include installation country/site, medium, capacity or flow with unit basis, operating/design pressure and temperature, quantity, destination requirements, optional equipment, requested date and transport constraints. Mark unknown items as open; send the existing specification, drawing or equipment list first.
Manufacturing, documents and delivery agreement
| Purchase item | Conditions to provide | Supply and responsibility boundary |
|---|---|---|
| Equipment origin | Identify tank fabrication within the accepted scope and each vaporizer, pump or valve train as in-house, specialist-sourced, jointly manufactured or integrated | The quotation identifies actual makers, applicable credentials and responsibilities; a requested destination approval is not an existing certification |
| Inspection and documents | Agree datasheets, interface drawings, ITP, material/welding/NDE records, tests, cleaning, insulation/vacuum checks and operating documents as applicable | State applicability, language, witness party, review points and final dossier index in the order |
| Packing and transport | Confirm final envelope, net/shipping weight, centre of gravity, lifting points, supports, preservation, packing and loose-item list | Agree port/road limits, shipping sections, handling equipment, delivery terms and transfer of risk for the project |
| Site work and local compliance | Overseas design, erection, piping, commissioning, inspection and turnkey requirements can be proposed and confirmed with qualified responsible parties for the actual scope | Equipment supply does not automatically include civil/fire/power works, permitting, medical-system validation or a complete station performance guarantee |
Evidence to check before order release
Confirm the proposed actual manufacturer, its current applicable credentials and scope, relevant equipment records, inspection plan and agreed sample dossier. Reference images show general manufacturing context only; specialist and joint supply retain the actual maker's identity.
Published fabrication and inspection evidence →Continue with the corresponding equipment or package
Large Atmospheric Cryogenic Flat-Bottom Tanks
Large atmospheric cryogenic flat-bottom tanks have a different procurement and construction scope from pressurized cryogenic vessels.
LNG Storage Tanks & Regasification Procurement
Order an LNG tank alone or list unloading, storage, regasification, reheating, pressure regulation, metering and project-required odorization as a package.
Ethylene & Ethane Cryogenic Storage Projects
Submit separate ethylene and ethane medium/duty datasheets and organize tanks, pumps, cryogenic piping, boil-off or recovery and controls around the chosen storage construction.
Selection and scope guide · Destination code, inspection and documentation inputs · Ask for a quote with the files you have
RFQ WORKSHEET
Cryogenic tank and gas supply RFQ
Fill in known conditions only. Attach your existing drawing, equipment list or specification; we can help clarify the rest.Include refill intervals and gas-flow units / reference conditions to relate inventory to vaporization duty. Oxygen cleanliness, nitrogen / argon purity, LNG composition / boil-off and CO2 phase control are reviewed for the service. For ethylene, ethane, atmospheric tanks, medical LOX and accessories, specify the service state, destination and responsibility boundaries separately.
Download RFQ worksheet (Excel, Chinese + English)No registration needed. Return the completed file through the inquiry form or email chenlei@cnhuawang.com.
PROJECT INQUIRY
One item, an equipment combination or a project package
Start with the files and conditions you have. Sales can clarify missing items; destination approvals, performance, lead time and site services need a project-specific agreement.