菏泽花王 SINCE 1984

TECHNICAL REFERENCE

Which Inputs Must Be Rechecked for a Repeat Vessel Order?

Approve the delta matrix before copying drawings or setting a repeat price.

DIRECT ANSWERA repeat order should compare the old approved unit with current service, design rules, materials, interfaces, accessories, marking, inspection, documents and destination. List every unchanged item with its verified revision, not just changed quantities.

Change-matrix rows

  • Old and new document revisions
  • Service, pressure, temperature and material
  • Nozzles, supports, accessories and nameplate
  • Inspection, batch, packing and destination

Relevant manufacturing capability

  • Drawing, datasheet and equipment-list manufacturability review
  • Self-manufactured and coordinated-supply scope identification
  • Technical, quality, document and delivery clarification

Key notes

  • 'Same as last time' is not a controlled manufacturing instruction.

FAQ

Frequently asked questions

01What if only the delivery location changes?

Check route, packing, markings, documents and applicable destination requirements even if the vessel geometry is unchanged.

RELATED

Related products and reference

PROJECT INQUIRY

Have a project? Send the drawings or technical conditions.

Send drawings, specifications, datasheets and design conditions for a manufacturability assessment based on the equipment type and project requirements.