菏泽花王 SINCE 1984

TECHNICAL REFERENCE

What Must Be Confirmed for Export Packing and Marine Preservation?

Approve a packing drawing and preservation schedule before shipment.

DIRECT ANSWERExport packing follows equipment size, shipping mode, climate, storage duration and destination handling. Define closures, moisture/corrosion protection, internals restraint, supports, tie-downs, lifting marks and inspection access.

Export preservation plan

  • Shipping mode, duration, climate and storage
  • Opening closures, internal/external preservation
  • Saddles, bracing, tie-downs and loose items
  • Marking, inspection, renewal and destination removal

Relevant manufacturing capability

  • Drawing, datasheet and equipment-list manufacturability review
  • Self-manufactured and coordinated-supply scope identification
  • Technical, quality, document and delivery clarification

Key notes

  • Domestic wrapping is not automatically suitable for sea freight or long storage.

FAQ

Frequently asked questions

01Who removes preservatives at destination?

The supply boundary should state method, safety, waste handling and responsible party.

RELATED

Related products and reference

PROJECT INQUIRY

Have a project? Send the drawings or technical conditions.

Send drawings, specifications, datasheets and design conditions for a manufacturability assessment based on the equipment type and project requirements.