How to Define Owner-Supplied and Vendor-Supplied Items

Use one responsibility matrix linked to the equipment list and interface register.

DIRECT ANSWERList each component and work package with design, procurement, fabrication/installation, inspection, transport handover and document responsibility plus required input and due date.

Supply responsibility matrix

  • Pressure parts, accessories and specialist items
  • Owner-free-issue items and delivery condition
  • Design/interface data and approval dates
  • Inspection, logistics, site and documents

Relevant manufacturing capability

  • Drawing, datasheet and equipment-list manufacturability review
  • Self-manufactured and coordinated-supply scope identification
  • Technical, quality, document and delivery clarification

Key notes

  • Owner supplied and complete package are too vague without item-level responsibility.

FAQ

Frequently asked questions

01Who inspects owner-supplied items?

The contract should assign incoming inspection, storage, integration, defects and schedule impact.

RELATED

Related products and reference

PROJECT INQUIRY

Have a project? Send the drawings or technical conditions.

Send drawings, specifications, datasheets and design conditions for a manufacturability assessment based on the equipment type and project requirements.