DIRECT ANSWERA multi-tag schedule links each vessel to drawing approval, long-lead materials, fabrication, inspection, testing, packing and site need date. Shared shop resources and batch transport can make the critical path differ by tag.
Tag-level schedule
- Approved document and material release dates
- Shop capacity and shared process bottlenecks
- ITP notices, tests and dossier release
- Transport lot and installation sequence
Relevant manufacturing capability
- Drawing, datasheet and equipment-list manufacturability review
- Self-manufactured and coordinated-supply scope identification
- Technical, quality, document and delivery clarification
Key notes
- One final delivery date hides which tag or hold point will delay the project.