How to State Welding and NDE Requirements in a Vessel RFQ

Request a preliminary weld and NDE matrix with the technical bid.

DIRECT ANSWERA welding/NDE RFQ must identify joint categories, materials, thicknesses, process and qualification requirements, NDE method and coverage, timing, acceptance criteria, repair and re-examination. Link these to the governing design documents and ITP.

Welding and NDE schedule

  • Joint map and weld type
  • WPS/PQR/welder qualification basis
  • RT/UT/MT/PT method, extent and stage
  • Acceptance, repair and records

Relevant manufacturing capability

  • Drawing, datasheet and equipment-list manufacturability review
  • Self-manufactured and coordinated-supply scope identification
  • Technical, quality, document and delivery clarification

Key notes

  • Writing '100% NDE' without method or acceptance basis leaves major ambiguity.

FAQ

Frequently asked questions

01When should NDE occur relative to PWHT?

The approved code, project specification and inspection plan determine stage; show any required pre- and post-treatment examinations explicitly.

RELATED

Related products and reference

PROJECT INQUIRY

Have a project? Send the drawings or technical conditions.

Send drawings, specifications, datasheets and design conditions for a manufacturability assessment based on the equipment type and project requirements.