How to Prepare Installation Handover Data for Vertical and Horizontal Vessels

Issue a signed interface pack before shipment and confirm site readiness.

DIRECT ANSWERInstallation handover should provide approved GA, support/foundation loads, nozzle orientation, shipping position, lifting attachments, unloading route, site responsibility and maintenance clearance.

Installation handover

  • GA, centre of gravity and support loads
  • Nozzle elevations/orientation and connected piping
  • Shipping, unloading, lifting and temporary support
  • Foundation, alignment, access and preservation

Relevant manufacturing capability

  • Project-specific storage-vessel manufacturability review
  • Material, welding, inspection and pressure-test control
  • Batch fabrication, documentation and large-equipment delivery coordination

Key notes

  • A manufacturing lift lug is not automatically approved for every site lift.

FAQ

Frequently asked questions

01Should orientation be chosen during installation?

No. It should already be established by approved design and reflected in foundations and piping.

RELATED

Related products and reference

PROJECT INQUIRY

Have a project? Send the drawings or technical conditions.

Send drawings, specifications, datasheets and design conditions for a manufacturability assessment based on the equipment type and project requirements.