菏泽花王 SINCE 1984

TECHNICAL REFERENCE

How to Clean Up Duplicate Tags and Inconsistent Equipment Names Before RFQ

Publish a signed master tag register and attachment mapping.

DIRECT ANSWERBefore RFQ, normalize equipment tags, names, service descriptions and quantity across the list, drawings and datasheets. Preserve an alias history so duplicate names do not cause duplicate quotes or omitted vessels.

List reconciliation

  • Unique tag and project area
  • Current name, service and quantity
  • Document references and revision
  • Alias, duplicate or retired-tag decision

Relevant manufacturing capability

  • Drawing, datasheet and equipment-list manufacturability review
  • Self-manufactured and coordinated-supply scope identification
  • Technical, quality, document and delivery clarification

Key notes

  • Renaming a tag without updating documents and vendor correspondence breaks traceability.

FAQ

Frequently asked questions

01What if two rows share a tag but differ in duty?

Treat it as a conflict, not an automatic duplicate; obtain the design owner's identity decision and record any split or merge.

RELATED

Related products and reference

PROJECT INQUIRY

Have a project? Send the drawings or technical conditions.

Send drawings, specifications, datasheets and design conditions for a manufacturability assessment based on the equipment type and project requirements.