菏泽花王 SINCE 1984

TECHNICAL REFERENCE

How Should Q345R and Q355R Be Treated in Engineering Selection?

Record the selected material and any substitution through formal design change control.

DIRECT ANSWERDo not substitute Q345R and Q355R by comparing grade numbers on a web page. The authorized design must use the applicable material standard and edition, service, thickness, temperature, supply condition and added requirements.

Material-basis verification

  • Applicable standard and edition
  • Service, design temperature and thickness
  • Supply condition and supplementary properties
  • Welding, heat treatment and inspection impacts

Relevant manufacturing capability

  • Material identification and traceability control
  • Qualified welding and heat-treatment process planning
  • NDE, repair and manufacturing-record closeout

Key notes

  • Availability or similar strength does not authorize substitution.

FAQ

Frequently asked questions

01May procurement approve the substitution alone?

No. The authorized design and project approval route must assess all technical effects.

RELATED

Related products and reference

PROJECT INQUIRY

Have a project? Send the drawings or technical conditions.

Send drawings, specifications, datasheets and design conditions for a manufacturability assessment based on the equipment type and project requirements.