What Should a Vessel Technical Bid Evaluation and Clarification Check?

Issue a signed clarification register and revised bid basis for each supplier.

DIRECT ANSWERCompare vessel bids on the same controlled datasheet and scope, then log deviations in design basis, material, inspection, documents, bought-out items, delivery and exclusions. Clarification should resolve technical comparability before commercial ranking.

Bid comparison fields

  • Document revision and design assumptions
  • Material and pressure-boundary configuration
  • NDE, tests, ITP and dossier
  • Accessories, packing, freight and schedule exclusions

Relevant manufacturing capability

  • Drawing, datasheet and equipment-list manufacturability review
  • Self-manufactured and coordinated-supply scope identification
  • Technical, quality, document and delivery clarification

Key notes

  • A lower price with missing inspection or scope is not a like-for-like offer.

FAQ

Frequently asked questions

01What if a bidder states 'as per specification' but excludes a line item?

Record the conflict, request a specific revised commitment and retain the original and clarified versions in the evaluation trail.

RELATED

Related products and reference

PROJECT INQUIRY

Have a project? Send the drawings or technical conditions.

Send drawings, specifications, datasheets and design conditions for a manufacturability assessment based on the equipment type and project requirements.