DIRECT ANSWERHeat-treatment need and cycle follow the material, thickness, joint and structure, welding procedure, approved design and applicable project requirements. The equipment name alone cannot decide it.
Heat-treatment decision inputs
- Material specification and thickness range
- Joint detail, restraint and welding procedure
- Code/design requirement and service restrictions
- Whole-vessel/local route, supports and thermocouple plan
Relevant manufacturing capability
- Material identification and traceability control
- Qualified welding and heat-treatment process planning
- NDE, repair and manufacturing-record closeout
Key notes
- Do not infer PWHT from vessel type or thickness alone.
