菏泽花王 SINCE 1984

TECHNICAL REFERENCE

What Must an RFQ Confirm for Tubesheets, Tubes and Tube Bundles?

Issue a coordinated tube layout and bundle drawing for review before drilling.

DIRECT ANSWERTube-bundle procurement must fix thermal duty and the mechanical interface: tube size, count and layout, material, tubesheet thickness and drilling, joint method, baffles, supports, pass partition, expansion allowance and extraction clearance.

Bundle interface checklist

  • Tube and tubesheet material, dimensions and layout
  • Tube-to-tubesheet joint and qualification
  • Baffle spacing, supports and pass arrangement
  • Shell fit, pull space, inspection and test

Relevant manufacturing capability

  • Drawing, datasheet and equipment-list manufacturability review
  • Self-manufactured and coordinated-supply scope identification
  • Technical, quality, document and delivery clarification

Key notes

  • A nominal exchanger diameter cannot establish replacement-bundle fit.

FAQ

Frequently asked questions

01How is a replacement bundle verified?

Compare measured shell, channel, gasket, pass and support interfaces with approved as-built dimensions before release.

RELATED

Related products and reference

PROJECT INQUIRY

Have a project? Send the drawings or technical conditions.

Send drawings, specifications, datasheets and design conditions for a manufacturability assessment based on the equipment type and project requirements.