DIRECT ANSWERA floating-head RFQ adds expansion, fouling, mechanical cleaning, floating-head type, sealing, bundle-pull space, separate-side testing and maintenance responsibilities to normal thermal data.
Floating-head RFQ
- Complete two-side thermal duty
- Floating-head configuration and sealing
- Bundle dimensions, pull space and handling
- Inspection, testing and maintenance boundary
Relevant manufacturing capability
- Shell, tubesheet, tube-bundle and pressure-boundary fabrication review
- Material, welding, NDE and test planning
- Bought-out component and package-interface coordination
Key notes
- The label floating head does not define every closure or test arrangement.
