DIRECT ANSWERFor an equipment package, allocate design, purchase, fabrication, assembly, inspection, testing, packing, installation and commissioning by item and interface. The matrix should distinguish the pressure item from valves, controls, utilities and site work.
Responsibility-matrix fields
- Item, tag and physical boundary
- Design and approval owner
- Supply, installation and test owner
- Document, warranty and interface owner
Relevant manufacturing capability
- Drawing, datasheet and equipment-list manufacturability review
- Self-manufactured and coordinated-supply scope identification
- Technical, quality, document and delivery clarification
Key notes
- A single 'turnkey' label does not settle electrical, piping or local-approval work.