Create a two-boundary datasheet and inspection matrix instead of using double wall as a label.

DIRECT ANSWERThe project drawings must define the difference. A double-wall enquiry also identifies each wall's function, pressure, temperature and material; interspace duty; leak collection/monitoring; supports; assembly and inspection.

Double-wall definition

  • Inner and outer boundary functions
  • Pressure, temperature and material for each boundary
  • Interspace, leak detection/collection and venting
  • Supports, assembly, testing and document separation

Relevant manufacturing capability

  • Project-specific storage-vessel manufacturability review
  • Material, welding, inspection and pressure-test control
  • Batch fabrication, documentation and large-equipment delivery coordination

Key notes

  • Double wall does not automatically mean a vacuum-insulated cryogenic tank.

FAQ

Frequently asked questions

01Can an old 100 m³ design be copied?

No. The current service, structure and approved design basis must be reviewed.

RELATED

Related products and reference

PROJECT INQUIRY

Have a project? Send the drawings or technical conditions.

Send drawings, specifications, datasheets and design conditions for a manufacturability assessment based on the equipment type and project requirements.