What Must a Double-Wall Liquid-Chlorine Tank RFQ Confirm?

Issue a responsibility and test matrix for both boundaries and the interspace.

DIRECT ANSWERDefine composition and contaminants; each wall's function, pressure, temperature and material; corrosion basis; interspace; leak monitoring/collection; supports, interfaces, welding, inspection, tests and records.

Two-boundary RFQ checklist

  • Inner/outer functions and design cases
  • Materials, corrosion and sealing interfaces
  • Interspace monitoring, collection, vent and access
  • Assembly, NDE, tests and boundary-specific records

Relevant manufacturing capability

  • Project-specific storage-vessel manufacturability review
  • Material, welding, inspection and pressure-test control
  • Batch fabrication, documentation and large-equipment delivery coordination

Key notes

  • A second wall does not by itself eliminate leakage or operating risk.

FAQ

Frequently asked questions

01Can the web page specify both wall materials?

No. The authorized design uses the actual function, medium, conditions and corrosion basis.

RELATED

Related products and reference

PROJECT INQUIRY

Have a project? Send the drawings or technical conditions.

Send drawings, specifications, datasheets and design conditions for a manufacturability assessment based on the equipment type and project requirements.