DIRECT ANSWERBuild-to-drawing uses approved design documents as the fabrication basis. Build-from-design-conditions also requires a named party to perform, check and approve design. The responsibility, price inputs and deliverables are different.
Responsibility split
- Who owns process and mechanical design
- Who approves drawings and design changes
- What the fabricator reviews for manufacturability
- Which calculations, drawings and records are delivered
Relevant manufacturing capability
- Drawing, datasheet and equipment-list manufacturability review
- Self-manufactured and coordinated-supply scope identification
- Technical, quality, document and delivery clarification
Key notes
- A fabrication suggestion does not silently transfer formal design responsibility.