DIRECT ANSWERAn ammonia tank cannot be selected from capacity alone. Approved project documents must define service composition, pressure and temperature cases, material, corrosion basis, nozzles, accessories, inspection, testing and delivery conditions.
Ammonia-tank review
- Normal, start-up and upset service conditions
- Material specification, supply condition and traceability
- Welding, NDE and any heat-treatment requirement
- Nozzles, safety accessories, supports and transport
Relevant manufacturing capability
- Project-specific storage-vessel manufacturability review
- Material, welding, inspection and pressure-test control
- Batch fabrication, documentation and large-equipment delivery coordination
Key notes
- Do not infer material or heat treatment from the words ammonia tank.
